Mississauga Transitway: Spectrum Station – Concrete Warming

//Mississauga Transitway: Spectrum Station – Concrete Warming

Mississauga Transitway: Spectrum Station – Concrete Warming

Mar. 21, 2016:

Inside the tarp covered frame, concrete is warmed to ensure it will set and cure properly.

This technique is used during cold weather to prevent improper curing.

2016-03-01T13:36:15+00:00