Mississauga Transitway: Orbitor Station – Concrete Placement

//Mississauga Transitway: Orbitor Station – Concrete Placement

Mississauga Transitway: Orbitor Station – Concrete Placement

Apr. 18, 2016:

Concrete is poured into a metal container and carried by a crane across the construction site at Orbitor Station.

2016-03-28T15:32:18+00:00